The Rod Laver has seen some incredible tennis players come through. ![]() The arena also looks amazing at night - with it's bright blue neon lights. When the roof is open, fans can see Melbourne's amazing downtown skyline from a distance. There are plenty of luxurious boxes where the bigwigs can enjoy tennis matches. It also makes the arena more versatile, in case they want to host a concert or other events when the weather is not permitting. This roof comes in handy, especially when those 120 degree temperatures during the Australian Open get too hot to handle. The first thing you notice is it's retractable roof. The Rod Laver Arena is one spectacular facility. The refurbishment of Rod Laver Arena is expected to be completed by October 2019, in preparation for the 2020 Australian Open.Rod Laver Arena entrance World Class Facility These changes will ensure the arena continues to operate as a world-class venue, as it has for the past 30 years. These include changes to existing ventilation and smoke spill rates, and a complex arrangement of smoke and fire zones with compartment control. To reduce onsite construction work, and overcome some of the site’s access limitations, offsite prefabrication techniques have also been used, including for piping systems, valve assemblies and air handling units.įire and life safety systems have also been upgraded in the arena to comply with current building codes. The addition of a new, high efficiency water-cooled chiller to the existing central chiller plant serving Rod Laver Arena will cater for the additional spaces in the facility, while upgrades to air handling units and existing fan systems have also been made to improve energy efficiency and performance. This has included the addition of new high efficiency IE3 motors and variable speed drives on existing equipment to improve the energy efficiency of the plant, and re-birthing the arena’s building management and control system (BMCS) to provide better functionality and control. Coombs has provided practical solutions to overcome the constraints of as-built conditions and demonstrated its technical ability to blend new technology with existing systems. With the project aiming to achieve a Gold Leadership in Energy and Environmental Design (LEED) certification upon completion, A.G. Coombs, which has led the services coordination and the extensive use of BIM (building information modelling) on the project. ![]() Outside of two blackout periods, works have had to be carried out while the arena has remained operational.įrom a mechanical services perspective, this has demanded careful pre-planning and procurement on the part of A.G. ![]() The refurbishment of Rod Laver Arena commenced immediately following the completion of the 2016 Australian Open.Ī tight completion timeframe has demanded that demolition, construction and reconstruction works be completed concurrently on site. Coombs’ familiarity of the shared services on the site has proven advantageous. Having previously been involved in the redevelopment of the adjacent Margaret Court Arena, A.G. Coombs was appointed by Lendlease as mechanical contractor, with a scope of works including the provision of HVAC and mechanical services to both new and existing infrastructure. Additionally, the existing internal concourse of the arena is being expanded to allow for improved patron movement and increased disability access.īehind the scenes, significant back-of-house improvements have also been made, including a larger loading bay and increased rigging capacity to allow for more – and bigger – concerts and shows to be hosted at the arena.Īs part of the arena’s multi-million dollar refurbishment by Development Victoria, A.G. This is being achieved through the construction of an eastern-facing annex that will create a new, primary entrance to the arena as well as accommodate new food and beverage offerings and visitor restrooms. While Stage 1, completed in 2013, focused primarily on the redevelopment of Margaret Court Arena and the construction of Eastern Plaza and the National Tennis Centre, the $338 million second stage of works includes a significant refurbishment to Rod Laver Arena.Īs the largest spectator venue at Melbourne Park with seating for 14,820 people, this is the first major construction work to take place on Rod Laver Arena since it opened in 1988.Ĭonstructed by Lendlease, the refurbishment will enhance the venue’s amenity, food service, patron comfort and accessibility. To cater for the future growth of the popular Australian Open tennis tournament, Melbourne Park has been under redevelopment for a number of years as it seeks to improve the comfort and amenity of patrons attending the precinct.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |